Project Introduction
This project mainly aims to solve the automatic storage and handling of electronic products, reduce manual labor, improve production efficiency, and achieve unmanned and automated operation of the entire factory.
Equipment composition: 2 stacker cranes, several shelves, 17 hidden vehicles, 3 CTU material box robots, and 1 system.